The trampolines are finished. The mast is fully rigged. Car and trailer are ready to get back to Germany. Painting underwater area is started.
Read More
logistics
Aug 19, 2012 | Post by: wavescalpel (mr) No Comments
WaveScalpel manufacturing diary 2012-08-19
May 03, 2012 | Post by: wavescalpel (mr) No Comments
WaveScalpel manufacturing diary 2012-05-03
beginning of May 2012 we are back on Crete to finish the woodworks, set up the mast and mount the engines. The launch is planned for mid August.
Read More
Read More
Jul 20, 2009 | Post by: wavescalpel (mr) No Comments
Logistics: Container shipping
The container is filled with 20 tons of alloy, stainless steel, tools and equipment for building the 18m x 10m bluewater cruising catamaran.
Read More
Read More
May 29, 2009 | Post by: wavescalpel (mr) No Comments
Logistics: Loading 15 tons of metal
finally two strong men have to close the container door. This means there can’t be a lot of movement in the container. But it was raising my heart beat rate. End of May the material is arranged so that the engines and other equipment plus tools can be stowed.