Monthly Archives July 2012

mast assembling Jul 26, 2012 | Post by: wavescalpel (mr) No Comments

WaveScalpel manufacturing diary 2012-07-26

The prefabricated mast sections are assembled into the 24m mast under the bridge of the ship. The shade is necessary in the cretan summer with temperatures of 40°C.

Read More
engine compartment Jul 21, 2012 | Post by: wavescalpel (mr) No Comments

WaveScalpel manufacturing diary 2012-07-21

The engine compartments are finished to take up the 30hp inboard engines plus 12V 800A alternators and 380V 8kW generator.

Read More