Monthly Archives August 2012

ready for launching Aug 31, 2012 | Post by: wavescalpel (mr) No Comments

WaveScalpel manufacturing diary 2012-08-31

The ship is ready for the launch. The hulls sitting on sledges will be pulled by excavators to the beach.

Read More
finished painting Aug 25, 2012 | Post by: wavescalpel (mr) No Comments

WaveScalpel manufacturing diary 2012-08-25

The underwater area is covered with epoxy primer and antifouling.

Read More
trampolines okay and all stays connected Aug 19, 2012 | Post by: wavescalpel (mr) No Comments

WaveScalpel manufacturing diary 2012-08-19

The trampolines are finished. The mast is fully rigged. Car and trailer are ready to get back to Germany. Painting underwater area is started.

Read More
mast erection Aug 02, 2012 | Post by: wavescalpel (mr) No Comments

WaveScalpel manufacturing diary 2012-08-02

The mast is being erected by my trusted crane operator. 800kg had to be handled with the crane hook 19m above the ground.

Read More