The ship is ready for the launch. The hulls sitting on sledges will be pulled by excavators to the beach.
Read More
Monthly Archives August 2012
Aug 31, 2012 | Post by: wavescalpel (mr) No Comments
WaveScalpel manufacturing diary 2012-08-31
Aug 25, 2012 | Post by: wavescalpel (mr) No Comments
WaveScalpel manufacturing diary 2012-08-25
Aug 19, 2012 | Post by: wavescalpel (mr) No Comments
WaveScalpel manufacturing diary 2012-08-19
The trampolines are finished. The mast is fully rigged. Car and trailer are ready to get back to Germany. Painting underwater area is started.
Read More
Read More
Aug 02, 2012 | Post by: wavescalpel (mr) No Comments
WaveScalpel manufacturing diary 2012-08-02
The mast is being erected by my trusted crane operator. 800kg had to be handled with the crane hook 19m above the ground.
Read More
Read More