mast assembling Jul 26, 2012 | Post by: wavescalpel (mr) No Comments

WaveScalpel manufacturing diary 2012-07-26

The prefabricated mast sections are assembled into the 24m mast under the bridge of the ship. The shade is necessary in the cretan summer with temperatures of 40°C.

Leave a Comment

Your email address will not be published. Required fields are marked *