mast erection Aug 02, 2012 | Post by: wavescalpel (mr) No Comments

WaveScalpel manufacturing diary 2012-08-02

The mast is being erected by my trusted crane operator. 800kg had to be handled with the crane hook 19m above the ground.

Leave a Comment

Your email address will not be published. Required fields are marked *