The prefabricated mast sections are assembled into the 24m mast under the bridge of the ship. The shade is necessary in the cretan summer with temperatures of 40°C.
Jul 26, 2012 | Post by: wavescalpel (mr) No Comments
The prefabricated mast sections are assembled into the 24m mast under the bridge of the ship. The shade is necessary in the cretan summer with temperatures of 40°C.